ENGINEERING and CONSTRUCTION
Project-based manufacturing where every job is its own P&L.
ERP for engineering and construction manufacturers
Engineering and construction work fails in the gaps: bids compared by hand, documents scattered across systems, billing that drifts from reality. Visibility ERP keeps project performance visible at all times, so you can act on a job while there is still time to change its outcome.
Industry-specific functionality
Project Management & Accounting
Contract & Services Management
Equipment Tracking
Estimating Workbench
Milestone Billings with Flexible Revenue Recognition
Estimate to Actual Cost Analytics
Flexible Reporting & Analytics
How engineering and construction runs on Visibility ERP
Every job is its own P&L: project management and accounting with milestone billings and flexible revenue recognition.
The estimating workbench connects quoting and order entry to the costs that actually land.
Estimate-to-actual analytics in business intelligence show variance while the project is live.
Material and resource planning works from the project structure, not around it.
Estimate-to-actual analytics show where a project stands while there is still time to act, not after close-out.
The estimate is the baseline, not a memory
Engineering and construction work fails in the gaps: bids compared by hand, documents scattered across systems, billing that drifts from what the work actually cost. By the time close-out arrives, nobody can say where the margin went.
Visibility ERP closes those gaps by making the estimate the baseline the whole job is measured against. The estimating workbench connects quoting and order entry to real cost data, so the bid reflects what the work will take. When the job is won, the estimate becomes the project structure: material and resource planning work from it rather than around it, procurement pegs to it, and execution data lands against it. Estimate-to-actual analytics in business intelligence show variance while the project is live, when there is still time to change the outcome.
Every job runs as its own P&L in project management and accounting, with equipment tracking and contract management on the same record.
Billing that matches the work
Long projects strain cash when billing waits for completion. Visibility ERP carries milestone billings with flexible revenue recognition, so invoicing follows the contract terms and revenue follows the accounting rules, percent-complete included, without a spreadsheet translating between the project manager and the controller.
Because billing, cost and progress read from the same project record, the questions that usually take a meeting, such as what has been billed, what has been earned and what remains, are answered by the system.
Common questions from engineering and construction manufacturers
What makes project-based ERP different from standard manufacturing ERP?
The unit of truth is the project, not the order. Visibility ERP treats each job as its own P&L with a work breakdown structure, project-pegged materials and labor, and billing tied to progress, while still running the shop floor beneath it.
How does progress billing work?
Milestone billings generate from the project structure as work completes, and flexible revenue recognition keeps the books aligned with percent-complete reality. Billing schedules follow the contract, not the calendar.
Can we see cost variance before close-out?
Yes. Estimate-to-actual analytics compare the bid against live actuals for the duration of the job, so overruns show up while there is still time to act on them.
How long is a typical implementation?
Four to six months for most companies, delivered by the same team that builds the product. Zero failed implementations since 1988.
Is it cloud or on premise?
Both are supported. Run it as SaaS with hosting, upgrades and backups managed by our team, or on premise. Browser based in both cases.
Ready when you are.
Bring your data and workflows. We'll show them running on Visibility ERP.