Schedule Advisor
Schedule a DemoFinite-capacity scheduling built for engineer-to-order work.
See the shop floor as it actually is, not as planned
A plan is a snapshot; a shop floor is not. Schedule Advisor is graphical, finite-capacity scheduling on top of Visibility ERP's shop floor and work in process data, so a planner sees real load against real capacity and can react to a machine going down or a rush order landing, not just replan from scratch.
How it works
A visual dispatch board shows scheduled and planned production against available capacity by work center, with routing operations, sequences and work order hierarchies enforced.
Planners drag and drop work orders to alternate dates or work stations, simulating a capacity change before committing to it.
Bottlenecks, preventative maintenance windows and unplanned downtime are visible in real time, not discovered after a delivery slips.
A firmed schedule imports back into Visibility ERP for execution, so the plan the floor works from is the one that was actually adjusted.
A plan is a snapshot; a shop floor is not. Schedule Advisor closes that gap in real time.
Finite where it matters, infinite where it does not
Real shops are not uniformly constrained. A bottleneck work center deserves finite scheduling; a bench operation with flexible staffing does not.
Finite and Infinite Scheduling
Every resource, labor, machine, tool or subcontract, is defined with its own capacity by date, shift or period and marked finite or infinite individually, so the schedule is strict exactly where the constraint is real and loose everywhere else.
The Graphical Dispatch Board
Scheduling automation runs forward, backward, priority-based and critical-ratio logic to generate the baseline plan, which a scheduler reviews on a visual dispatch board that can be deployed at work stations themselves, giving the floor the same view as the planner.
Resolving Overloads
Where a finite resource is overloaded, the board and dispatch list flag it immediately: the system can move work into the next available timeframe automatically, or a planner drags it to an alternate date or work center and sees the load impact instantly, before committing to the change.
Importing the Firmed Schedule
Once a schedule is firmed, it imports back into Visibility ERP for execution, enforcing operation sequences and work order hierarchies, so the shop floor runs the schedule that was actually adjusted rather than the one originally planned.
Common questions about Schedule Advisor
Can finite and infinite scheduling run together?
Yes, per resource. Constrained work centers run finite while flexible ones run infinite, which keeps the schedule honest at the bottleneck without over-constraining everything else.
What counts as a resource?
Labor, machines, tools and subcontract operations, each with capacity defined by date, shift or period. Load is calculated from the work order operations flowing through each resource.
Does it resolve overloads automatically?
It can. Overloaded finite resources are flagged on the board and dispatch list; the Shop Control scheduling engine can move the operation to the next available timeframe automatically, or the planner adjusts it by drag and drop with the impact visible immediately.
Ready when you are.
Bring your data and workflows. We'll show them running on Visibility ERP.