Managing released engineering data is one of the biggest risks in manufacturing. When PLM or PDM systems are not connected to ERP, teams rely on manual processes that introduce errors, delays, and revision mismatches.
PLM/PDM-to-ERP integration solves this by synchronizing approved engineering data directly with Visibility ERP. QBuild Software’s PLMSync enables manufacturers to automate this process while maintaining strict control over product data and revisions.
Engineering teams carefully control when data is released—but that control is often lost when transferring data into ERP.
Without integration:
PLMSync ensures that only released, approved data flows into Visibility ERP—automatically and accurately.
The integration between Visibility ERP and PLMSync is driven by a deep, long-standing relationship between Visibility and QBuild Software. As an essential component of QBuild Software’s Engineering-to-ERP Solutions, PLMSync bridges the gap between design lifecycle data and manufacturing execution.
This partnership is uniquely effective because QBuild’s tools are designed by engineers, for engineers, and implemented by engineers. By combining Visibility’s robust ERP capabilities with QBuild’s firsthand understanding of engineering workflows, the collaboration ensures that manufacturers get a reliable, technically accurate integration that streamlines the entire transition from the release of PDM/PLM data to the shop floor.
By integrating PLM/PDM systems with Visibility ERP, manufacturers establish a controlled digital thread from engineering release to production execution.
This ensures that only approved, up-to-date product data reaches the shop floor, reducing errors, preventing rework, and improving overall manufacturing efficiency.
Once released data lands in Visibility ERP, it’s immediately usable – item masters update, multi-level BOMs sync, and the “As-Designed” record becomes the “As-Manufactured” baseline production works from. That tight handoff is what prevents outdated revisions from slipping into a work order, which is often where costly rework actually starts.