Solution Details
Project budgets are established immediately during the
proposal stage - All departments participate to insure
estimates are accurate. Project estimate budgets can easily
be converted to live project budgets upon winning the
contract. Project history retention adds reusable data that
speeds the creation of estimates. This streamlines the
entire estimating process.
The integrated data that flows from the VISIBILITY
Enterprise system facilitates collaboration -
Operationally, all internal departments and contracted
resources can easily communicate with one another. They can
respond quickly and effectively to the next phase of
engineering and production since they now have the right
information, at the right time and in the right place. A
comprehensive production plan is established with
engineering to begin the procurement and fabrication of long
lead-time components while design work continues on other
elements.
Work Breakdown Structure (WBS) - Using VISIBILITY
Project Accounting, the enterprise now develops early
estimates, final proposal and working budgets in a WBS that
matches the upcoming collection of actual material and labor
expenses. The project includes early estimating and design
tasks in their WBS providing cost control for these phases
as well as for traditional production tracking. Change
orders, installation and service are also budgeted. Each
Project Manager can develop unique WBS structures or use
pre-existing templates.
Time phase management of projects are planned and tracked
using Primavera© or Microsoft® Project - The client
maintains WBS templates in Microsoft Project and initiates
WBS structures via the VISIBILITY Project Link interface.
Operating managers download project information into
Microsoft Project (including budgets, actual costs and
timelines) for portable viewing and operational meetings.
Working budgets are easily revised - Using the
project budget loader (Visibility’s linked, pre-formatted
Microsoft Excel spreadsheet product), schedule changes
developed in Microsoft Project are synchronized into Project
Accounting via the VISIBILITY Project Link interface.
The dual bookkeeping aspect of Project Accounting -
Using this capability, eliminate the friction between
financial accountants who need to prepare period end
financial data and project cost accountants who need to
track key cost drivers of each project along with
comparisons against the budgets.
Clear view of estimate to actual - As work progresses
from the design activity into the production phases, through
change orders and into the installation and service phases,
tracking reports in Project Accounting keeps the
estimate-to-actual view in front of the operating managers.
Tight integration throughout the Enterprise - The
VISIBILITY ERP system integrates all business functions
throughout the enterprise while Project Accounting
capabilities dramatically improve project execution and
profitability.
|